Elhorya hospital






Description
Rehabilitation and Renovation of the hospital including;
- All the concrete and building work with the steel stair;
- All the electrical work from scratch including the network system, telephone system, sound system, earth work and the generator;
- All the A/C work including central A/C’s;
- All the plumbing work including all the all sanitary ware;
- The gypsum board work (partitions, ceiling and 60X60 ceiling system;
- The aluminum work;
- The painting work including anti Bacteria panting;
- All the tiling work, handrails, marble work;
- Nursing call system;
- Fire alarm system;
- The façade cladding;
- New electronic sliding door for the entrance with secure glass;
- Vinyl flooring;
- New wooden doors, cladding and cabinets;